The project includes the transition from the aerial network to a underground one. This will allow the new network to develop alongside one of the limits of the Porto Seco installations. Suplly and assembly of two tryphasic circuits of 60 kV in Viana near Porto Seco. Each circuit has about 1600 m and four terminal.