Building north and south road connections to the bridge over giraul de baixo river. This one is located on the road that connects Namibe to Baia das Pipas. The connections, with two driveways and sideways and a total of 10,20 m width were executed in flexible bituminous concrete paving over selected soils basis. The work comprises drainage, vertical and horizontal signaling, rebuilding of the marginal dykes and embankments consolidation.