Holder wall structure strengthning by the introduction of steel linkings linked to walls and braking pillars of cast concrete. Rehabilitation of the rain water drainage network, pavings repositioning and public lighting.
client
Ministério do Urbanismo e Construção/ Direcção Nacional de Infraestruturas Públicas
project
Rua gamal abdel nasser holder wall rehabilitation
activity
Contest for contractors, proposals evaluation and works controlling
Empresa Certificada - eiC - ISO 9001 - certificação acreditada - IPAC