Construction of a prism with 240 m with TOT rock-fill with the riverside bank protected by a layer of selected rock-fill with an approximate thickness of 0,8 m with 1 - 3 kN range rock. In the stairs downstream zone was conceived a concrete hold wall in a 50 m extension.